Assessment scope and applicability
ChangedWhat changed
Level 3 uniquely requires all systems in the desired scope to have already achieved Final Level 2 status before a Level 3 assessment can proceed, and it more explicitly addresses specialized assets by requiring either full assessment against all CMMC requirements or segregation into purpose-specific networks. Level 1 and Level 2 document scope and N/A treatment similarly, but the provided Level 3 material goes further on prerequisite status and specialized-asset scope handling.
Why it matters
Someone planning a Level 3 assessment must account for the prerequisite Final Level 2 status and the special treatment of specialized assets; that affects scoping, readiness planning, and whether a desired assessment can even begin. For Level 1 and Level 2, the main difference is the protected information type and associated requirement set, not a fundamentally different scoping model.