Skip to content
✦ Made with Docsie · generated from video

How to Connect to a PLC in TIA Portal

This guide shows you how to connect to a PLC in TIA Portal from your PC over an Ethernet cable. You create a project, add and detect your Siemens PLC, and establish the connection. You then configure the PLC security settings, compile the project, download it to the PLC, and check the status indicators.

TIA Portal 18 steps 14 screenshots 1017 words Source video 3:54 Generated cost $1.40

Video: How to connect your PC to Siemens PLC using TIA Portal and Ethernet Cable by SparkLearning (2025). All credit for the demonstration goes to the creator; watch the original on YouTube. The written guide below was generated from this video by Docsie. Creator? Request a change or removal.

This guide shows you how to connect to a PLC in TIA Portal from your PC over an Ethernet cable. You create a project, add and detect your Siemens PLC, and establish the connection. You then configure the PLC security settings, compile the project, download it to the PLC, and check the status indicators.

Prerequisites

Before you start, make sure you have:

  • A PC with Siemens TIA Portal installed
  • A Siemens PLC
  • An Ethernet cable to connect your PC to the PLC

Create a new project

1

Open TIA Portal

Launch the Siemens TIA Portal software on your PC. Wait for the start screen to load. It shows options such as Open existing project and Create new project, along with a list of recently used projects.

TIA Portal start screen with project options and a list of recently used projects
TIA Portal start screen with project options and a list of recently used projects
2

Create a new project

Click Create new project in the left sidebar. An input field for the project details appears at the top of the window.

Enter a name for your project. For example, type Spark One. Then click Create.

The Create new project option selected, with the project name input field visible
The Create new project option selected, with the project name input field visible
3

Open the project view

If prompted after the project is created, click Open the project view. The main TIA Portal interface appears, with the project tree on the left side.

TIA Portal main interface with the project tree and the option to add a new device
TIA Portal main interface with the project tree and the option to add a new device

Add and detect your PLC

4

Add a new device

In the project tree, right-click your project name (for example, SPARK1) and select Add new device. The Add new device dialog opens and shows device categories such as Controllers, HMI, and PC systems.

5

Select the PLC model

Under Controllers, expand the list and select the specific PLC you are using. In this example, expand SIMATIC ET200 CPU.

If you are unsure of the exact model, select Unspecified ET 200SP CPU. This lets TIA Portal detect the actual PLC automatically.

Add new device dialog with Controllers expanded and the SIMATIC ET200 CPU options visible
Add new device dialog with Controllers expanded and the SIMATIC ET200 CPU options visible
6

Connect the Ethernet cable

Physically connect your PC to the PLC using an Ethernet cable.

7

Start hardware detection

Click OK or Add to add the unspecified PLC to your project. The device configuration view opens and shows a warning that the device is not specified.

Click the detect link or button to start the hardware detection process.

8

Search for the PLC

In the hardware detection dialog, select the appropriate PG/PC interface (for example, Intel(R) Ethernet Controller). Click Start search to scan for connected devices.

When the scan completes, select your PLC from the list. In this example, the entry is Device: plc_1, Device type: CPU 15125P F-1 PN, Address: 192.168.0.3.

Hardware detection dialog showing the detected PLC device, device type, and address
Hardware detection dialog showing the detected PLC device, device type, and address
9

Connect to the PLC

Click Detect to confirm the device selection. If a security warning appears (for example, "plc_1 might not be a trustworthy device"), review the certificate information if necessary. Then click Connect.

Wait a few seconds for the connection process to complete. The PLC is now connected and ready for further configuration or programming.

Connection warning dialog with the Connect button highlighted
Connection warning dialog with the Connect button highlighted

Configure PLC security settings

10

Deactivate protection of confidential PLC data

In the PLC security settings dialog, select Protection of confidential PLC data. For learning purposes, make sure Protection of confidential PLC configuration data deactivated is selected.

Leave the password fields empty and do not set up a password. Click Next.

PLC security settings dialog with protection deactivated and the password fields empty
PLC security settings dialog with protection deactivated and the password fields empty
11

Remove secure internet HMI (if prompted)

If you are prompted about secure internet HMI, remove this option for learning purposes. Click Next to continue.

12

Set the access level without a password

In the PLC access protection section, open the Access level without password dropdown menu. Select Full access incl. fail-safe (no protection).

This setting gives all users full access to operations, including safety-related project data, without password protection. Click Finish to apply the settings.

PLC access protection dialog with Full access incl. fail-safe (no protection) selected
PLC access protection dialog with Full access incl. fail-safe (no protection) selected

Compile and download the project

13

Compile the project

After you finish the security configuration, compile your project to check for errors or warnings. In the main TIA Portal interface, review the results in the Compile tab at the bottom.

Make sure the message reads "Compiling finished (errors: 0; warnings: 1)" or similar. A single warning is generally not critical for learning purposes.

TIA Portal compile results showing 0 errors and 1 warning
TIA Portal compile results showing 0 errors and 1 warning
14

Start the download to the PLC

Click the Download to device button (the downward arrow icon) in the toolbar to start downloading your compiled project to the PLC. Wait a few seconds for the process to start.

If prompted, search for the PLC device again using the same procedure as in step 8.

The Download to device button highlighted in the TIA Portal toolbar
The Download to device button highlighted in the TIA Portal toolbar
15

Check the load preview

In the Load preview dialog, review the checklist before you load:

  • Make sure the target PLC is correct (for example, PLC_1).
  • Review any protection or warning messages.
  • Confirm actions such as Stop modules, Delete and replace system data in target, and Download software to device.

Click Load to download the project to the PLC.

Load preview dialog with the checklist and the Load button
Load preview dialog with the checklist and the Load button
16

Wait for loading to complete

Wait for the loading process to finish. The new project overwrites any previous program on the PLC.

Check the status in the Messages or Info tab at the bottom of the screen. A message such as "Loading completed (errors: 0; warnings: 0/1)" indicates a successful download.

Loading completed message in TIA Portal with 0 errors and 1 warning
Loading completed message in TIA Portal with 0 errors and 1 warning

Verify the connection status

17

Check the project tree status indicators

Look at the project tree on the left side of the TIA Portal interface. Make sure all modules and devices display a green checkmark icon.

Green checkmarks indicate that your program is correct and all components are functioning as expected.

TIA Portal project tree with all modules showing green checkmarks, indicating a correct configuration with no errors
TIA Portal project tree with all modules showing green checkmarks, indicating a correct configuration with no errors
18

Interpret status colors

A color other than green, such as yellow or amber, on the project tree or device overview signals a problem. These indicators may point to issues with your PLC, your computer, or the connection between them.

To investigate, review the warnings or errors in the Details view or the Messages tab at the bottom of the screen.

TIA Portal device overview and project tree, showing why green status indicators matter
TIA Portal device overview and project tree, showing why green status indicators matter

Summary

You now know how to connect to a PLC in TIA Portal. You created a project, added and detected a Siemens PLC over Ethernet, and connected to it. You then configured the security settings for learning purposes, compiled the project, and downloaded it to the PLC. Finally, you confirmed the result with the green status indicators in the project tree.

Generation details: cost, quality tiers

Docsie billed 2,000 credits ($1.40) to analyze this 4-minute video at standard quality. The rewrite, template fill and Word/PDF exports were included. The same video at each quality tier:

QualityFrames sampledCreditsApprox. cost
Draftevery 16-30 s1,000$0.70
Standard (this guide)every 8-15 s2,000$1.40
Detailedevery 4-7 s4,000$2.80
Ultraevery 1-3 s8,000$5.60

Credits priced at $0.70 per 1,000; plans include a monthly allowance. Enterprise customers on on-premise or bring-your-own-model deployments run this on their own inference and pay no per-video credits.

Generated by Docsie Video-to-Docs on 2026-11-24 from a 3-minute video. Screenshots are frames from the source video and belong to their creator, SparkLearning , whose original is embedded above. If you own this video and want the guide removed or credited differently, contact us and we will act within one business day.

Turn your own training videos into guidesJoin teams that save hours, reduce documentation work and scale training with Docsie.
See Docsie in action. No commitment.

Ready to Transform Your Documentation?

Start creating professional documentation that your users will love