Contract Overview
Project name, main contractor, subcontractor trade, subcontract value, and contract period.
Free Construction Template
SOW for [trade] on [project]
Use this template to sOW for [trade] on [project].
| Field | Details |
|---|---|
| Category | Construction |
| Owner | [Team or owner] |
| Version | [Version number] |
| Effective Date | [Date] |
| Review Cycle | [Monthly / Quarterly / Annual / Event-based] |
| Status | [Draft / In Review / Approved] |
Project name, main contractor, subcontractor trade, subcontract value, and contract period.
| Item | Details | Owner | Status |
|---|---|---|---|
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]
Two-column table or side-by-side lists clearly defining what is included in the subcontract scope and what is explicitly excluded. Be specific to avoid disputes.
| Item | Details | Owner | Status |
|---|---|---|---|
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]
Key technical requirements the subcontractor must meet: materials, standards, tolerances, testing requirements, and design responsibilities (if any).
| Item | Details | Owner | Status |
|---|---|---|---|
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]
Table with key milestones: activity, start date, completion date, and any float or dependencies. Include mobilisation, key work phases, testing/commissioning, and demobilisation.
| Item | Details | Owner | Status |
|---|---|---|---|
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]
List of documents, certificates, and records the subcontractor must provide: method statements, risk assessments, test certificates, as-built drawings, O&M manuals, warranties.
| Item | Details | Owner | Status |
|---|---|---|---|
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]
Quality standards, inspection regime, non-conformance procedure, and any third-party inspection requirements.
| Item | Details | Owner | Status |
|---|---|---|---|
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]
Working hours, access routes, welfare facilities, storage areas, hoisting arrangements, site induction requirements, and coordination with other trades.
| Item | Details | Owner | Status |
|---|---|---|---|
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]
Payment terms: milestones or monthly valuations, retention percentage, defects liability retention, payment timeline, and required documentation for payment applications. Be clear and unambiguous. This document forms.
| Item | Details | Owner | Status |
|---|---|---|---|
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]
Document review conclusions, approvals, unresolved items, and next review date.
| Role | Name | Date | Notes |
|---|---|---|---|
| Preparer | [Name] | [Date] | [Notes] |
| Reviewer | [Name] | [Date] | [Notes] |
| Approver | [Name] | [Date] | [Notes] |
Template Structure
Use this construction template as a starting point, then customize each section to match your internal workflow, evidence, and signoff needs.
Project name, main contractor, subcontractor trade, subcontract value, and contract period.
Two-column table or side-by-side lists clearly defining what is included in the subcontract scope and what is explicitly excluded. Be specific to avoid disputes.
Key technical requirements the subcontractor must meet: materials, standards, tolerances, testing requirements, and design responsibilities (if any).
Table with key milestones: activity, start date, completion date, and any float or dependencies. Include mobilisation, key work phases, testing/commissioning, and demobilisation.
List of documents, certificates, and records the subcontractor must provide: method statements, risk assessments, test certificates, as-built drawings, O&M manuals, warranties.
Quality standards, inspection regime, non-conformance procedure, and any third-party inspection requirements.
Working hours, access routes, welfare facilities, storage areas, hoisting arrangements, site induction requirements, and coordination with other trades.
Payment terms: milestones or monthly valuations, retention percentage, defects liability retention, payment timeline, and required documentation for payment applications. Be clear and unambiguous. This document forms.
Write a Subcontractor Scope of Work document for a specific trade on a construction project. Structure with:
Project name, main contractor, subcontractor trade, subcontract value, and contract period.
Two-column table or side-by-side lists clearly defining what is included in the subcontract scope and what is explicitly excluded. Be specific to avoid disputes.
Key technical requirements the subcontractor must meet: materials, standards, tolerances, testing requirements, and design responsibilities (if any).
Table with key milestones: activity, start date, completion date, and any float or dependencies. Include mobilisation, key work phases, testing/commissioning, and demobilisation.
List of documents, certificates, and records the subcontractor must provide: method statements, risk assessments, test certificates, as-built drawings, O&M manuals, warranties.
Quality standards, inspection regime, non-conformance procedure, and any third-party inspection requirements.
Working hours, access routes, welfare facilities, storage areas, hoisting arrangements, site induction requirements, and coordination with other trades.
Payment terms: milestones or monthly valuations, retention percentage, defects liability retention, payment timeline, and required documentation for payment applications.
Be clear and unambiguous. This document forms part of the subcontract agreement.
Project: Greenfield Regional Hospital, Phase 2 Extension Main Contractor: Henley Build Group Subcontractor Trade: Mechanical HVAC Installation Subcontract Value: $2,840,000 Contract Period: May 1, 2026 — March 31, 2027
| Included | Excluded |
|---|---|
| Supply and install all AHUs (6 no.) per mechanical drawings M-200 to M-245 | Main electrical supply to plant (by electrical subcontractor) |
| Supply and install ductwork distribution, VAV boxes, and diffusers all floors | BMS controls and programming (by BMS subcontractor; coordinate only) |
| Supply and install chilled water and heating pipework from plant to terminals | Structural openings and builder's work (provided by main contractor) |
| Refrigerant pipework for split systems (operating theatres) | Fire damper installation in fire-rated walls (by fire protection sub) |
| Insulation of all pipework and ductwork per spec M-001 | Commissioning of fire dampers (by fire sub; witness only) |
| Testing, balancing, and commissioning of all HVAC systems | Roof penetration weatherproofing (by roofing subcontractor) |
| As-built drawings, O&M manuals, and warranties | Painting of exposed ductwork in public areas (by painting sub) |
| Milestone | Start | Complete | Dependency |
|---|---|---|---|
| Mobilisation & material procurement | 2026-05-01 | 2026-05-31 | Access to plant rooms |
| Plant room equipment installation | 2026-06-01 | 2026-07-31 | Builder's work complete in plant rooms |
| Riser pipework (all floors) | 2026-07-01 | 2026-09-30 | Structural risers open |
| Floor-level ductwork (Floors 1-3) | 2026-08-01 | 2026-11-30 | Ceiling grid coordination |
| Operating theatre HVAC fit-out | 2026-10-01 | 2026-12-31 | Theatre shell complete |
| Testing & balancing | 2027-01-06 | 2027-02-28 | All systems installed |
| Commissioning & handover | 2027-03-01 | 2027-03-31 | BMS integration complete |
| Milestone | % of Contract | Amount | Conditions |
|---|---|---|---|
| Mobilisation | 5% | $142,000 | On commencement + approved programme |
| Plant room installation complete | 20% | $568,000 | Equipment installed, inspected |
| Riser pipework complete (all floors) | 20% | $568,000 | Pressure tested, certified |
| Ductwork installation complete | 25% | $710,000 | Duct leakage test passed |
| Testing & balancing complete | 20% | $568,000 | TAB report approved |
| Commissioning & handover | 10% | $284,000 | All deliverables submitted |
Retention: 5% retained from each payment, released as: 2.5% at practical completion, 2.5% at end of defects liability period (12 months). Payment terms: 30 days from receipt of valid invoice with supporting documentation.
Record a walkthrough, training session, or process demonstration. Docsie AI turns it into structured documentation using this template as the starting framework.
Use the template manually, or let Docsie generate the first draft from source footage.
Daily reporting for [project]
QC inspections for [work package]
Work method for [construction activity]
Required permits for [project type]
Handover of [project] to [client/operator]
Safety procedures for [project/site]
Template FAQ
Common questions about using and generating a subcontractor Scope of Work.
Q: What is a subcontractor Scope of Work?
A: A subcontractor Scope of Work is a structured document for sow for [trade] on [project].
Q: Can I download this subcontractor Scope of Work as Word or PDF?
A: Yes. This page includes free downloads in DOCX, PDF, and Markdown formats so you can edit, share, or import the template into your documentation system.
Q: Can Docsie generate this from a video?
A: Yes. Upload a process walkthrough, training recording, or screen capture to Docsie, then use this template structure to generate a first draft automatically.