How to Do a Pre-shift Inspection on a Battery Electric Underground Loader
This checklist explains how to do a pre-shift inspection on a battery electric underground loader, using the ST14 battery powered loader as the example. It covers the checks that differ from a diesel loader: battery locks, high voltage and low voltage connections, and battery charge. It also covers the startup and shutdown sequences for the battery system and hydraulics.
Video: How to conduct a pre-shift inspection and machine startup | Scooptram ST14 battery by Epiroc USA (2023). All credit for the demonstration goes to the creator; watch the original on YouTube. The written guide below was generated from this video by Docsie. Creator? Request a change or removal.
This checklist explains how to do a pre-shift inspection on a battery electric underground loader, using the ST14 battery powered loader as the example. It covers the checks that differ from a diesel loader: battery locks, high voltage and low voltage connections, and battery charge. It also covers the startup and shutdown sequences for the battery system and hydraulics.
Work through the sections in order. Tick each box as you complete the check. The electrical startup steps must be finished before you start the hydraulic system.
Equipment details
Record the following before you begin the inspection:
- [ ] Equipment ID: __
- [ ] Equipment type: battery electric underground loader
- [ ] Model: ST14 battery powered loader
- [ ] Hour meter: read total hours of use from the graphical user interface (GUI) after startup (the example screen shows 26.9 hours)
- [ ] Location: __
- [ ] Shift: __
- [ ] Inspector: __
The source does not define the equipment ID, location, shift or inspector fields. Fill them in according to your site's records.
Differences from a diesel loader
- Check battery locks and electrical connections instead of engine oil.
- Check battery charge instead of fuel level.
- Still check transmission oil and hydraulic oil.
Safety systems
The material for this procedure covers only the cab door and the battery isolation switches in this category. Brakes, steering, lights, alarms, fire suppression, seat belt, access systems and emergency stops belong in this section, but the source gives no check steps for them. Add them according to your site procedure.
- [ ] The cab door is securely closed. The hydraulic system will not start while the door is open.
- [ ] The machine battery isolation switch and the main battery isolation switch are both in the ON position before you request power from the cab (see the electrical startup steps).

Mechanical checks
Tires or tracks, buckets, blades, pins, guards, leaks and structural damage belong in this section. The source gives no steps for them. Add them according to your site procedure.
Battery locks and fastening
- Inspect the battery locks and confirm they are in the correct position.
- Confirm the battery is securely fastened to the loader frame.
- [ ] Battery locks are in the correct position.
- [ ] Battery is securely fastened to the loader frame.
Transmission oil
- Inspect the transmission oil level.
- Confirm the level is within the recommended range.
- [ ] Transmission oil level is within the recommended range.
You do not need to check engine oil on the battery powered loader.
Hydraulic checks
Hoses, cylinders, fittings, pressure indicators and contamination signs belong in this section. The source gives no steps for them. Add them according to your site procedure.
Check the hydraulic oil level
- Inspect the hydraulic oil level.
- Confirm the level is adequate.
- [ ] Hydraulic oil level is adequate.
Review the auxiliary motor and system indicators
Complete the electrical startup steps first so that the GUI is powered. Then review the GUI before you start the hydraulic system.
The example screen shows the following values:
- Auxiliary motor hours: 26.9 h
- Power draw: 12 kW
- Battery state of charge (SOC): 74%
- Travel speed: 0 mph, with a limit of 21 mph
The GUI also shows load indications, travel speed, the travel speed limiter, and other system icons and warnings. Confirm all indicators are within normal operating ranges.

- [ ] Auxiliary motor hours, power draw, SOC and travel speed are displayed and normal.
- [ ] No unresolved warnings appear on the GUI.
Start the hydraulic system
- Confirm the cab door is closed.
- Locate the start button on the operator console, as indicated on the GUI.
- Press the start button to start the hydraulic system. This is similar to starting a diesel-powered machine.

Confirm the system responds
- Listen for the hydraulic motor starting.
- Watch the GUI for an increase in power consumption. This confirms the hydraulic system is active.

- [ ] Hydraulic motor starts.
- [ ] Power consumption increases on the GUI.
Electrical checks
Inspect the battery connections and charge
- Inspect both the high voltage and low voltage connections to the battery.
- Confirm all connections are securely in place and undamaged.
- Turn on the Rig Control System (RCS) and check the battery charge level indicator. Make sure the charge is sufficient before operation, just as you would check the fuel level on a diesel loader.

- [ ] High voltage connections are secure and undamaged.
- [ ] Low voltage connections are secure and undamaged.
- [ ] Battery charge is sufficient for the shift.
Energize the control circuits
- Go to the non-cab side of the loader and locate the battery isolation switch. This switch sends 24V control power to the RCS and the high voltage battery pack.
- Turn the battery isolation switch to the ON position.
- Go to the cab side of the loader.
- Close the main switch for the high voltage battery to enable power flow to the loader systems.

- [ ] Battery isolation switch is ON.
- [ ] Main high voltage battery switch is closed.
Confirm both isolation switches are closed
Battery voltage connects to the loader only after a request is made from inside the cab. Before you make that request, confirm that both the machine battery isolation switch and the main battery isolation switch are closed. The loader cannot receive power from the battery pack unless both are ON.

- [ ] Machine battery isolation switch is ON.
- [ ] Main battery isolation switch is ON.
Start the Rig Control System
- Enter the cab. The RCS sends the signal to the battery to close the high voltage bus and deliver power to the loader.
- Power on the RCS using the GUI inside the cab.
- The RCS sends the start command to the battery pack, which connects the high voltage from the battery to the loader.

Watch the connection status indicator
- Find the connection status indicator in the lower left-hand corner of the GUI.
- Watch it flash from white to green while the system tries to connect.
- Wait for the indicator to turn solid green.
A solid green indicator confirms the high voltage bus is connected from the battery pack to the machine and the loader has power.
- [ ] Connection status indicator is solid green.
Review system information on the GUI
Check the GUI for the key operational data:
- State of charge (SOC) for the battery: 74% on the example screen
- Available current and power
- Current rate of power consumption
- Total hours of use: 26.9 hours on the screen, which is roughly 27 hours
- Other system indicators and warnings

Radios, cameras and telemetry also belong in this section. The source gives no steps for them. Add them according to your site procedure.
- [ ] SOC, available power and hours of use are reviewed and acceptable.
Shut down the loader
Shut down in this order:
- Turn off the hydraulic auxiliary motor from the operator console.
- Power down the RCS using the GUI inside the cab. This disconnects the high voltage bus from the battery to the machine.
- Exit the cab, go to the battery compartment, and turn off the main battery isolation switch. This fully disconnects the battery pack from the loader.
- As the final step, isolate the machine batteries on the 24V supply side.


- [ ] Hydraulic auxiliary motor is off.
- [ ] RCS is shut down and the high voltage bus is disconnected.
- [ ] Main battery isolation switch is off.
- [ ] Machine batteries are isolated on the 24V supply side.
Defects
Remove-from-service criteria
Do not energize the loader or start the hydraulic system if any of the following is true:
- [ ] A battery lock is not in the correct position, or the battery is not securely fastened to the loader frame.
- [ ] A high voltage or low voltage connection is loose, out of place or damaged.
- [ ] The battery charge is not sufficient for the shift.
- [ ] The transmission oil or hydraulic oil level is outside the recommended or adequate range.
- [ ] The cab door cannot be closed. The hydraulic system will not start with the door open.
- [ ] The connection status indicator does not turn solid green after the RCS start.
Severity ratings and formal removal-from-service rules for other defects belong to your site's policy. The source does not define them.
Defect log
Record each defect you find.
| Defect | Severity | Action | Work order | Equipment status |
|---|---|---|---|---|
| ☐ In service ☐ Removed from service | ||||
| ☐ In service ☐ Removed from service | ||||
| ☐ In service ☐ Removed from service |
Signoff
The source does not define signoff roles or fields. Record the operator, supervisor, maintenance release and date and time here according to your site procedure.
| Role | Name | Signature | Date and time |
|---|---|---|---|
| Operator | |||
| Supervisor | |||
| Maintenance release |
What's next
For additional information or troubleshooting, contact your local dealer or Epiroc Service Center.
Generation details: cost, quality tiers, downloads
Docsie billed 2,500 credits ($1.75) to analyze this 5-minute video at standard quality. The rewrite, template fill and Word/PDF exports were included. The same video at each quality tier:
| Quality | Frames sampled | Credits | Approx. cost |
|---|---|---|---|
| Draft | every 16-30 s | 1,250 | $0.88 |
| Standard (this guide) | every 8-15 s | 2,500 | $1.75 |
| Detailed | every 4-7 s | 5,000 | $3.50 |
| Ultra | every 1-3 s | 10,000 | $7.00 |
Credits priced at $0.70 per 1,000; plans include a monthly allowance. Enterprise customers on on-premise or bring-your-own-model deployments run this on their own inference and pay no per-video credits.
Generated by Docsie Video-to-Docs on 2026-11-25 from a 4-minute video. It was generated straight into Docsie's Equipment Inspection Checklist template, so every section of that template is filled from the video. Screenshots are frames from the source video and belong to their creator, Epiroc USA, whose original is embedded above. If you own this video and want the guide removed or credited differently, contact us and we will act within one business day.