Skip to content

Free Mining & Metals Template

Free Ore Processing SOP

Standardize crushing, grinding, flotation, leach, or refining steps for [ore/process stream]

Scope Feed Requirements Startup Operating Parameters Sampling Upset Conditions Shutdown

Ore Processing SOP

Use this template to standardize crushing, grinding, flotation, leach, or refining steps for [ore/process stream].

Template Metadata

Field Details
Category Mining & Metals
Owner [Team or owner]
Version [Version number]
Effective Date [Date]
Review Cycle [Monthly / Quarterly / Annual / Event-based]
Status [Draft / In Review / Approved]

Scope

Define plant area, ore type, process circuit, and production objective.

Item Details Owner Status
[Item or requirement] [Describe the relevant detail, evidence, or decision] [Owner] [Open / Complete]
[Item or requirement] [Describe the relevant detail, evidence, or decision] [Owner] [Open / Complete]

Notes

[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]

Feed Requirements

List ore blend, size, moisture, grade range, contaminants, and stockpile controls.

Item Details Owner Status
[Item or requirement] [Describe the relevant detail, evidence, or decision] [Owner] [Open / Complete]
[Item or requirement] [Describe the relevant detail, evidence, or decision] [Owner] [Open / Complete]

Notes

[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]

Startup

Provide pre-start checks, interlocks, water, reagents, conveyors, mills, and control room confirmations.

Item Details Owner Status
[Item or requirement] [Describe the relevant detail, evidence, or decision] [Owner] [Open / Complete]
[Item or requirement] [Describe the relevant detail, evidence, or decision] [Owner] [Open / Complete]

Notes

[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]

Operating Parameters

Table target ranges for throughput, density, grind size, reagent dose, pH, temperature, and recovery.

Item Details Owner Status
[Item or requirement] [Describe the relevant detail, evidence, or decision] [Owner] [Open / Complete]
[Item or requirement] [Describe the relevant detail, evidence, or decision] [Owner] [Open / Complete]

Notes

[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]

Sampling

Define sample points, frequency, method, lab tests, and reporting.

Item Details Owner Status
[Item or requirement] [Describe the relevant detail, evidence, or decision] [Owner] [Open / Complete]
[Item or requirement] [Describe the relevant detail, evidence, or decision] [Owner] [Open / Complete]

Notes

[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]

Upset Conditions

State response to blocked chutes, high density, low recovery, pump trips, spills, and alarms.

Item Details Owner Status
[Item or requirement] [Describe the relevant detail, evidence, or decision] [Owner] [Open / Complete]
[Item or requirement] [Describe the relevant detail, evidence, or decision] [Owner] [Open / Complete]

Notes

[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]

Shutdown

Document normal and emergency shutdown steps, isolation, cleanup, and handover. Use plant-operator language with exact targets and escalation points.

Item Details Owner Status
[Item or requirement] [Describe the relevant detail, evidence, or decision] [Owner] [Open / Complete]
[Item or requirement] [Describe the relevant detail, evidence, or decision] [Owner] [Open / Complete]

Notes

[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]

Review and Signoff

Document review conclusions, approvals, unresolved items, and next review date.

Role Name Date Notes
Preparer [Name] [Date] [Notes]
Reviewer [Name] [Date] [Notes]
Approver [Name] [Date] [Notes]

Template Structure

What the Ore Processing SOP Includes

Use this mining & metals template as a starting point, then customize each section to match your internal workflow, evidence, and signoff needs.

1

Scope

Define plant area, ore type, process circuit, and production objective.

2

Feed Requirements

List ore blend, size, moisture, grade range, contaminants, and stockpile controls.

3

Startup

Provide pre-start checks, interlocks, water, reagents, conveyors, mills, and control room confirmations.

4

Operating Parameters

Table target ranges for throughput, density, grind size, reagent dose, pH, temperature, and recovery.

5

Sampling

Define sample points, frequency, method, lab tests, and reporting.

6

Upset Conditions

State response to blocked chutes, high density, low recovery, pump trips, spills, and alarms.

7

Shutdown

Document normal and emergency shutdown steps, isolation, cleanup, and handover. Use plant-operator language with exact targets and escalation points.

Recommended Structure

Write an ore processing SOP. Structure with these Markdown sections:

Scope

Define plant area, ore type, process circuit, and production objective.

Feed Requirements

List ore blend, size, moisture, grade range, contaminants, and stockpile controls.

Startup

Provide pre-start checks, interlocks, water, reagents, conveyors, mills, and control room confirmations.

Operating Parameters

Table target ranges for throughput, density, grind size, reagent dose, pH, temperature, and recovery.

Sampling

Define sample points, frequency, method, lab tests, and reporting.

Upset Conditions

State response to blocked chutes, high density, low recovery, pump trips, spills, and alarms.

Shutdown

Document normal and emergency shutdown steps, isolation, cleanup, and handover.

Use plant-operator language with exact targets and escalation points.

Example Filled Template

SOP - Copper Flotation Rougher Circuit

Scope

This SOP covers operation of Rougher Cells R1-R6 processing sulfide copper ore from Stockpile S3.

Feed Requirements

  • P80 feed size: 150 um target after milling
  • Feed grade: 0.45-0.85% Cu
  • Slurry density: 32-36% solids

Operating Parameters

Parameter Target Alarm Limit
Feed rate 420 tph <380 or >455 tph
pH 10.5 <10.2
Collector dose 28 g/t +/- 5 g/t
Frother dose 18 g/t +/- 4 g/t

Sampling

Take rougher feed and tail samples every 2 hours. Submit to lab for Cu, Fe, and insoluble assays.

Upset Conditions

If froth collapses in two or more cells, verify air flow, check reagent pumps, and notify metallurgist if not restored within 10 minutes.

Skip Manual Drafting

Generate a Ore Processing SOP from a Video

Record a walkthrough, training session, or process demonstration. Docsie AI turns it into structured documentation using this template as the starting framework.

Use the template manually, or let Docsie generate the first draft from source footage.

DOCX, PDF, and Markdown downloads
Works with process and training videos

Template FAQ

Ore Processing SOP FAQ

Common questions about using and generating a ore Processing SOP.

Using This Template

Q: What is a ore Processing SOP?

A: A ore Processing SOP is a structured document for standardize crushing, grinding, flotation, leach, or refining steps for [ore/process stream].

Q: Can I download this ore Processing SOP as Word or PDF?

A: Yes. This page includes free downloads in DOCX, PDF, and Markdown formats so you can edit, share, or import the template into your documentation system.

Q: Can Docsie generate this from a video?

A: Yes. Upload a process walkthrough, training recording, or screen capture to Docsie, then use this template structure to generate a first draft automatically.