Overview
State the system, target go-live date and time, deployment approach, and the decision authority for go/no-go.
Free Consulting Template
Go-live preparation for [system] deployment
Use this template to go-live preparation for [system] deployment.
| Field | Details |
|---|---|
| Category | Consulting |
| Owner | [Team or owner] |
| Version | [Version number] |
| Effective Date | [Date] |
| Review Cycle | [Monthly / Quarterly / Annual / Event-based] |
| Status | [Draft / In Review / Approved] |
State the system, target go-live date and time, deployment approach, and the decision authority for go/no-go.
| Item | Details | Owner | Status |
|---|---|---|---|
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]
Provide a detailed timeline table counting down to go-live. Columns: T-minus Time, Activity, Owner, Status (checkbox), Go/No-Go Gate. Cover from T-14 days through T+3 days (post go-live).
| Item | Details | Owner | Status |
|---|---|---|---|
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]
List all technical readiness checks that must pass before go-live. Include infrastructure, application, integration, security, and performance checks. Use a checklist format.
| Item | Details | Owner | Status |
|---|---|---|---|
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]
Detail the data freeze schedule, final data extraction, delta migration, and reconciliation steps.
| Item | Details | Owner | Status |
|---|---|---|---|
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]
Define specific, measurable conditions that trigger a rollback. Include the rollback decision authority and the rollback procedure summary.
| Item | Details | Owner | Status |
|---|---|---|---|
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]
Provide the war room setup (physical and virtual), communication channels, and a contacts table with name, role, phone, and availability.
| Item | Details | Owner | Status |
|---|---|---|---|
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]
Define what will be monitored during hypercare, alert thresholds, and escalation procedures. Use Markdown with tables and checklists. Be precise about timing and ownership.
| Item | Details | Owner | Status |
|---|---|---|---|
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]
Document review conclusions, approvals, unresolved items, and next review date.
| Role | Name | Date | Notes |
|---|---|---|---|
| Preparer | [Name] | [Date] | [Notes] |
| Reviewer | [Name] | [Date] | [Notes] |
| Approver | [Name] | [Date] | [Notes] |
Template Structure
Use this consulting template as a starting point, then customize each section to match your internal workflow, evidence, and signoff needs.
State the system, target go-live date and time, deployment approach, and the decision authority for go/no-go.
Provide a detailed timeline table counting down to go-live. Columns: T-minus Time, Activity, Owner, Status (checkbox), Go/No-Go Gate. Cover from T-14 days through T+3 days (post go-live).
List all technical readiness checks that must pass before go-live. Include infrastructure, application, integration, security, and performance checks. Use a checklist format.
Detail the data freeze schedule, final data extraction, delta migration, and reconciliation steps.
Define specific, measurable conditions that trigger a rollback. Include the rollback decision authority and the rollback procedure summary.
Provide the war room setup (physical and virtual), communication channels, and a contacts table with name, role, phone, and availability.
Define what will be monitored during hypercare, alert thresholds, and escalation procedures. Use Markdown with tables and checklists. Be precise about timing and ownership.
Write a Go-Live Checklist for a system deployment. Structure with these sections:
State the system, target go-live date and time, deployment approach, and the decision authority for go/no-go.
Provide a detailed timeline table counting down to go-live. Columns: T-minus Time, Activity, Owner, Status (checkbox), Go/No-Go Gate. Cover from T-14 days through T+3 days (post go-live).
List all technical readiness checks that must pass before go-live. Include infrastructure, application, integration, security, and performance checks. Use a checklist format.
Detail the data freeze schedule, final data extraction, delta migration, and reconciliation steps.
Define specific, measurable conditions that trigger a rollback. Include the rollback decision authority and the rollback procedure summary.
Provide the war room setup (physical and virtual), communication channels, and a contacts table with name, role, phone, and availability.
Define what will be monitored during hypercare, alert thresholds, and escalation procedures.
Use Markdown with tables and checklists. Be precise about timing and ownership.
| Item | Detail |
|---|---|
| System | SAP S/4HANA Finance (GL, AP, AR, Asset Accounting) |
| Go-Live Date | Saturday, February 15, 2026 at 06:00 UTC |
| Approach | Big-bang cutover with 48-hour maintenance window |
| Go/No-Go Authority | Steering Committee (CIO + CFO + Project Director) |
| Go/No-Go Decision | Friday, February 14 at 14:00 UTC |
| T-Minus | Date/Time | Activity | Owner | Gate |
|---|---|---|---|---|
| T-14d | Feb 1 | UAT sign-off confirmed | QA Lead | Go/No-Go |
| T-7d | Feb 8 | Final transport import to PRD | SAP Basis | — |
| T-5d | Feb 10 | Hypercare team briefing and runbook walkthrough | PM | — |
| T-3d | Feb 12 | Legacy system data freeze (AP/AR) | Legacy Admin | Go/No-Go |
| T-2d | Feb 13 | Final delta data extraction from legacy | Migration Lead | — |
| T-1d | Feb 14, 14:00 | GO / NO-GO DECISION | Steering Committee | Go/No-Go |
| T-1d | Feb 14, 18:00 | Legacy system set to read-only | Legacy Admin | — |
| T-0 | Feb 15, 06:00 | GO-LIVE: Maintenance window begins | Cutover Lead | — |
| T+2h | Feb 15, 08:00 | Delta data migration load complete | Migration Lead | Go/No-Go |
| T+4h | Feb 15, 10:00 | Post-migration validation scripts pass | QA Lead | Go/No-Go |
| T+6h | Feb 15, 12:00 | Smoke test by finance power users | Business Lead | Go/No-Go |
| T+8h | Feb 15, 14:00 | SAP production opened to all users | SAP Basis | — |
| T+1d | Feb 16 | Day-1 monitoring and first daily close | Hypercare Team | — |
| T+3d | Feb 18 | First week-start processing (payments, reports) | Finance Ops | — |
| Step | Timing | Activity | Verification |
|---|---|---|---|
| 1 | T-3d | Freeze AP invoice entry in legacy | No new invoices after cutoff |
| 2 | T-2d | Extract final AP/AR open items | Row count matches legacy report |
| 3 | T-1d | Extract GL trial balance as of Feb 14 | Trial balance nets to zero |
| 4 | T+1h | Load delta records into SAP (LSMW) | Load log shows zero errors |
| 5 | T+3h | Reconcile: SAP trial balance = legacy trial balance | Variance < $0.01 |
| Trigger | Threshold | Decision |
|---|---|---|
| Data migration validation failures | > 1% records with errors | Cutover Lead escalates to Steering |
| Trial balance mismatch | Variance > $100 | Mandatory rollback |
| SAP system instability | > 3 critical dumps in 1 hour | SAP Basis initiates rollback |
| Integration failures | > 5 failed message deliveries | Pause go-live, assess with middleware team |
Rollback procedure: Restore PRD from pre-cutover backup (RTO: 4 hours), re-enable legacy system for write access, notify all users via email blast.
Point of no return: T+1d — once daily close is executed in SAP, rollback is no longer feasible.
Location: TechNova HQ — Conference Room A (Floor 3) + Microsoft Teams channel "SAP Go-Live War Room"
| Name | Role | Phone | Availability |
|---|---|---|---|
| Sarah Kim | Cutover Lead | +1-555-0101 | Feb 14–18 (24/7) |
| James Okafor | SAP Basis Lead | +1-555-0102 | Feb 15–16 (on-site) |
| Priya Sharma | Data Migration Lead | +1-555-0103 | Feb 14–16 (on-site) |
| David Lin | MuleSoft Integration | +1-555-0104 | Feb 15 (on-call) |
| Rachel Torres | Finance Business Lead | +1-555-0105 | Feb 15–18 (on-site) |
| SAP Support | Vendor (Sev1 SR) | SAP ONE Support Launchpad | 24/7 |
| Metric | Tool | Alert Threshold | Escalation |
|---|---|---|---|
| SAP system response time | SM66 / Early Watch | > 5 sec avg | SAP Basis |
| Failed IDocs (integrations) | BD87 | Any failed IDoc | Integration team |
| User login failures | SM04 / Security Audit Log | > 10 in 30 min | SAP Security |
| Batch job failures | SM37 | Any critical job failure | SAP Basis |
| Application errors | ST22 (ABAP dumps) | Any dump | ABAP developer on-call |
Record a walkthrough, training session, or process demonstration. Docsie AI turns it into structured documentation using this template as the starting framework.
Use the template manually, or let Docsie generate the first draft from source footage.
Handover of [project] to [client] operations
Migrating [data type] from [source] to [target]
Configuration of [module] in [ERP system]
Technical architecture for [client] [project]
Requirements for [client] [project]
User acceptance testing for [system/module]
Template FAQ
Common questions about using and generating a go-Live Checklist.
Q: What is a go-Live Checklist?
A: A go-Live Checklist is a structured document for go-live preparation for [system] deployment.
Q: Can I download this go-Live Checklist as Word or PDF?
A: Yes. This page includes free downloads in DOCX, PDF, and Markdown formats so you can edit, share, or import the template into your documentation system.
Q: Can Docsie generate this from a video?
A: Yes. Upload a process walkthrough, training recording, or screen capture to Docsie, then use this template structure to generate a first draft automatically.