# Method Statement

> Use this template to work method for [construction activity].

## Template Metadata

| Field | Details |
|-------|---------|
| Category | Construction |
| Owner | [Team or owner] |
| Version | [Version number] |
| Effective Date | [Date] |
| Review Cycle | [Monthly / Quarterly / Annual / Event-based] |
| Status | [Draft / In Review / Approved] |

## Scope of Work

Describe the activity, its location within the project, and the expected duration. Identify the responsible supervisor and the number/trades of operatives involved.

| Item | Details | Owner | Status |
|------|---------|-------|--------|
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |

### Notes

[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]

## Plant & Equipment

Table listing all plant, equipment, and materials required, including quantities and any certification/inspection requirements (e.g., LOLER for lifting equipment).

| Item | Details | Owner | Status |
|------|---------|-------|--------|
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |

### Notes

[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]

## Sequence of Operations

Numbered step-by-step instructions for carrying out the work safely and to specification. Each step should be clear enough for a site operative to follow. Include hold points where supervisor sign-off is required.

| Item | Details | Owner | Status |
|------|---------|-------|--------|
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |

### Notes

[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]

## Risk Assessment

Table with columns: Hazard, Risk (who is harmed and how), Likelihood (1-5), Severity (1-5), Risk Rating, Control Measures. Cover all significant hazards associated with the activity.

| Item | Details | Owner | Status |
|------|---------|-------|--------|
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |

### Notes

[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]

## Quality Checks

Table listing inspection/check points, acceptance criteria, method of verification, and responsible person. Include any hold points requiring third-party or client sign-off. Use clear, directive language ("shall",.

| Item | Details | Owner | Status |
|------|---------|-------|--------|
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |
| [Item or requirement] | [Describe the relevant detail, evidence, or decision] | [Owner] | [Open / Complete] |

### Notes

[Add context, assumptions, exceptions, evidence links, screenshots, calculations, or reviewer comments.]

## Review and Signoff

Document review conclusions, approvals, unresolved items, and next review date.

| Role | Name | Date | Notes |
|------|------|------|-------|
| Preparer | [Name] | [Date] | [Notes] |
| Reviewer | [Name] | [Date] | [Notes] |
| Approver | [Name] | [Date] | [Notes] |
